Nassau County Commercial Build-Outs: Permit Types to Sort Out Before a Dumpster and Restroom Arrive
Short answer: For commercial work in unincorporated Nassau County, the Building Department sorts jobs into shell building, tenant build-out, alterations and repairs, and new building permits. A tenant build-out applies when a new tenant is moving into a space, and the County says it must carry everything needed for a Certificate of Occupancy; partial building, plumbing, electrical or mechanical permits are not issued for it. Knowing which type you have tells you when the work, and the debris, will actually start.
This guide summarizes Nassau County pages as read on November 14, 2026. The County Building Department permits unincorporated Nassau County only; Fernandina Beach, Callahan and Hilliard are separate jurisdictions, and a County permit does not cover work inside them. The guideline memo cited below is Bulletin G-04-17 dated June 23, 2017, so confirm current practice with the Department. This is not legal advice.
How the County defines the permit types
- Shell building: generally mercantile, business or storage occupancies where the basic structure is built (exterior walls, storefronts, roof) but the tenant spaces are not all finished. The memo says a shell is not considered ready for human occupancy.
- Tenant build-out: any construction in an individual tenant space when the tenant is new to that space, whether first-time or a later new tenant needing modifications.
- Alterations and repairs: work in an existing occupied space with no change of tenant, or on a building exterior, after the initial space has been permitted, inspected and given a Certificate of Occupancy.
- New building: a new building that is not one of the above; the memo says a shell plus a separate tenant build-out for each tenant is required if the plans do not cover the full build-out.
Read the County’s shell building and tenant build-out guidelines and the Building Department page, which says the County uses an online permitting portal and that inspections requested for the next workday must be called in before 4 p.m. the day before or scheduled online until midnight.
Owner-builder limits for commercial buildings
The County’s Owner Builder Affidavit states that an owner may build or improve a commercial building without a contractor license only if the cost does not exceed $75,000 and the work is for the owner’s own use. The owner must personally appear and sign the permit application at the County office, per the Building Department page. A tenant improving a leased space is a different situation, so ask the Department how it applies; see the owner-builder affidavit.
Timing the dumpster and portable restrooms
- Demolition phase: a gut-out sends out drywall, ceilings, flooring and fixtures in a short window. Schedule the container for that window, not the permit-approval date.
- Active construction: shells under construction often have no finished restrooms, so crews rely on portable units. We can arrange portable restrooms along with the dumpster; tell us crew size and expected duration.
- Sorting: keep hazardous items out of the container; see our Nassau County hazardous waste guide. Concrete, rock and dirt need confirmation for each order.
- Demolishing instead? The County requires all debris removed before the final inspection on a demolition permit; see our Nassau County demolition timeline.
- Inside Fernandina Beach: City rules apply; see our County vs. Fernandina Beach re-roof guide for how the two departments differ.
Ready to plan? Start an online order or quote, see our roll-off dumpster options or portable toilet rentals, or contact us with the job address. Availability, sizes and dates are confirmed per address, and concrete, rock and dirt require confirmation for each order before they can be accepted.
Quick FAQ
Does a Nassau County tenant build-out permit cover Fernandina Beach?
No. The County Building Department permits unincorporated areas. Fernandina Beach, Callahan and Hilliard have their own jurisdictions.
Can a new tenant get a separate plumbing or electrical permit first?
The County’s memo says partial building, plumbing, electrical and mechanical permits are not issued for a tenant build-out; it must provide everything needed for the Certificate of Occupancy.
Posted on November 14, 2026 in General